A timesheet approval workflow is the set of steps hours travel through before they reach payroll or an invoice: the worker records and submits, a designated reviewer checks, errors go back with a note, and an approver signs off and locks the period. For field crews, the workflow only holds up if the reviewer can see what happened on the site, not just what the worker typed. This guide shows how to set one up, who should approve, how to handle rejections, and what records to keep.

Hefieldops

Bring Field Records Into Review

Connect field activity with office management to support workforce visibility and ensure site activity is documented for efficient review and billing.

Explore field operations

TL;DR

Table of Contents

What a timesheet approval workflow does

Approval is different from collecting timesheets. Collection answers “what did people say they worked?” Approval answers “did someone other than the worker confirm it, and is the period now closed?” Those are two separate controls: a second pair of eyes, and a cut-off.

In practice the workflow protects two money flows. On the payroll side, it keeps wrong hours from becoming wrong paychecks. On the billing side, it keeps unverified labor from landing on an invoice or pay application, where a rejection costs weeks. Our guide on time and materials billing covers how field steps feed that second flow.

There is also a legal floor. Under the federal wage and hour law, covered employers must keep records of hours worked and wages earned for non-exempt workers, and the Department of Labor says those records must be accurate. The law does not prescribe a particular form, so the workflow you design is yours to shape, as long as the data is right and retrievable.

The five steps of an approval workflow

Published guides describe the sequence in slightly different words. One four-step version has the employee submit to a manager, the manager review for errors, missed punches and tardiness, the employee fix and resubmit if needed, and the manager sign off and send to payroll. For construction, we split it into five steps so nothing hides between “submitted” and “approved”.

  1. Record. Crew members or the foreman log hours daily against the job, cost code and task, plus any pay attributes such as overtime or per diem. Daily beats weekly: memory of Tuesday fades by Friday.
  2. Submit. The worker, or the foreman for the crew, marks the period complete. Nothing is reviewable until it is submitted.
  3. Review. A supervisor checks exceptions: missing days, hours that exceed the shift, entries on a job that was not staffed, or hours that disagree with the daily report.
  4. Correct. Rejected entries go back with a specific note. The original entry stays in the history, and the correction is a new, dated entry.
  5. Approve and lock. The approver signs off. The period locks and releases to payroll and job costing.

The order is the point. Review has to sit between submission and approval. When approvers click through without a review step, the approval is only a signature and catches nothing.

Workflow states to configure

Whatever tool you use, the states should be unambiguous. A typical set is pending, submitted, approved, rejected and locked. Each state change should carry a timestamp and the name of whoever made it, so you can answer “who approved this and when?” months later.

State | Who moves it | What it means | Editable?

Pending | Worker or foreman | Hours being recorded | Yes

Submitted | Worker or foreman | Period complete, waiting for review | No, except by reviewer

Rejected | Reviewer | Sent back with a note | Yes, by worker

Approved | Approver | Hours verified | No

Locked | System or approver | Released to payroll and billing | Only via logged adjustment

Who should approve, and how to route it

The first reviewer should be the person closest to the work: a foreman, crew lead or project supervisor who knows who was on site and what was done. Project managers or operations managers then act as the second level for exceptions. Payroll or billing specialists receive approved data; they should not be the ones deciding whether hours are right.

Keep authority boundaries explicit. A supervisor can confirm hours, but should not be able to change a bill rate. Payroll can process approved hours, but should not decide what is billable to the client. When those lines blur, corrections become arguments.

Routing rules that prevent bottlenecks

Field schedules are unpredictable. A supervisor on a remote site with weak signal can stall a whole crew’s pay. Build in:

These figures are starting points, not rules. Set them to match your pay cycle and how fast your crews can realistically submit.

How to build the workflow for a construction or field team

Office-based approval guides assume everyone sits at a desk and logs hours into a single timesheet. Field work breaks that in a few ways: crews split across several jobs in a day, time is tied to cost codes and equipment, and the supervisor may not see the whole crew. Here is how we would set it up.

Step 1: Decide what a timesheet must contain

Before you design approvals, decide what approved data has to include. At minimum: worker, date, job or project, cost code or task, start and stop or total hours, overtime flag, and any equipment used. Our page on what to track on construction timesheets walks through formats and fields.

Step 2: Set three deadlines

An approval workflow without clocks drifts. A pattern that works for distributed teams has three boundaries: workers submit by a fixed time at the end of the period, supervisors review by a second fixed time, and corrections come back within a short window. Work backward from your payroll run, and aim to resolve disputes a day before it. A simple example: submit Friday at 5 PM, review by Monday noon, corrections within 24 hours.

Step 3: Define what triggers a rejection

Write the reasons down so reviewers act consistently. Common triggers on a jobsite:

Step 4: Connect the review to site evidence

The weakest approvals compare a timesheet only against itself. Stronger ones compare it against the daily record of that site: who was assigned, what work was logged, what equipment ran. If your daily construction reports are captured the same day on mobile, the reviewer can check the crew list against the timesheet in a minute rather than phoning the foreman.

Site visibility helps in the same way. Where cameras cover a remote site, the review can confirm that a crew was active on the day in dispute. Our guide to construction site surveillance for project managers explains how camera roles can serve as billing proof.

Step 5: Lock, then release

Once approved, lock the period. If a mistake surfaces afterward, route it through a controlled adjustment with a reason and a name attached. The adjustment should show as its own line, so the original approved record stays intact. Then release approved hours to payroll and job costing. Our notes on payroll automation for construction cover what to automate at this handoff and what a person should still check.

Handling rejections, overtime and late submissions

Write rejection notes that can be acted on

“Wrong, fix it” costs two more rounds of messages. A useful rejection says what is wrong and what to change. For example: “Tuesday shows 10 hours on the Elm Street job, but the daily report lists you on the Main Street crew. Please move 4 hours to Main Street and confirm.” The reviewer does the diagnosis once, and the worker does one correction.

Keep every rejection and correction in the record. A digital logbook for recurring checks shows the same principle in another setting: follow-up actions and supporting documents sit next to the original entry, so accountability survives staff changes.

Treat overtime as an exception path

Overtime is where payroll errors cost the most. Flag any day or week above your threshold and send those entries to a second approver, usually the project manager who assigned the work. The second approver confirms the overtime was authorized and charged to the right job. Leave entries are another common source of mismatch, and reviewing them against your leave records matters; this overview of PTO tracking software by use case is useful when you are deciding how leave balances should reach payroll.

Late submissions

Decide in advance what happens when a timesheet misses the deadline. Options: it rolls into the next period with a flag, or a supervisor can submit on the worker’s behalf with a note. Whichever you choose, make it the same for everyone. Never skip the review step because of lateness; late entries are the ones most likely to be reconstructed from memory.

Records for certified payroll and prevailing-wage jobs

On public-works projects, the approval workflow feeds a compliance document. Maryland, for example, requires contractors to submit certified payroll electronically within 14 days after each payroll period ends, using Form WH-347 or an equivalent, numbered serially from payroll number one. The records must include project and job information and employee details, including daily straight-time and overtime hours, pay rate, fringe benefits and gross wages. Rules differ by state and contract, so check the requirements for your own jobs.

Enforcement is real. A San Francisco prevailing-wage fact sheet notes that compliance means paying correct prevailing rates and submitting certified payroll reports and fringe benefit statements, and that enforcement can include random inspections with access to time sheets, payroll records and paychecks. In other words, your approved timesheets may be the first thing an inspector asks for.

For your workflow, that means three things: capture job and classification detail at the time of entry, lock approved periods so the certified report matches what was approved, and keep an adjustment trail. Our page on certified payroll reporting shows how field records help catch contractor errors before they reach the report.

Perspective

Most approval problems we see in the field are not approval problems. They are context problems. A reviewer is asked to approve hours without knowing which crew was assigned, what work was logged or what equipment was running.

That is why we built Hawkeye Field Ops around a connected, audit-ready record from field activity to office review. Crew assignments, labor and equipment tracking, field tickets and daily work records sit in one place, with configurable workflows that capture operational context from assignment through billing. Each handoff is clear and traceable.

Our mobile surveillance adds situational awareness for remote sites, and workforce readiness tracking shows whether the people on a job were prepared for it. When the reviewer can see all of that, approval becomes a real check instead of a rubber stamp, and billing and payroll documents can be prepared from records that have already been reviewed.

Client

Put the workflow into one system

A workflow written on paper still depends on people chasing each other. Hawkeye Field Ops brings crew scheduling, job planning, labor and equipment tracking, field ticketing and daily work records together, and prepares billing and payroll documents from the approved record. It is built for construction, field services and utilities teams, where the person approving hours is rarely the person who saw the work.

If you manage crews and want to see how approvals, site records and payroll handoff connect, explore Hawkeye Field Ops or look at the people and payroll module. For labor-specific detail, see our guide to construction labor tracking for project managers.

A one-page checklist to start with

If you are replacing an informal process this month, begin small:

  1. List the fields every timesheet must carry, including job and cost code.
  2. Name a first-level reviewer and a backup for every crew.
  3. Set the submission, review and correction deadlines against your payroll run.
  4. Write the five or six rejection triggers and share them with supervisors.
  5. Choose the exceptions that go to a second approver, starting with overtime.
  6. Lock approved periods and define the adjustment path.
  7. Check, after one pay cycle, how many timesheets were rejected and why. The reasons tell you which field or training gap to fix next.

FAQ

What are the steps in a timesheet approval process?

The worker records and submits hours, a reviewer checks them for errors and exceptions, mistakes go back with a note for correction, and an approver signs off and locks the period for payroll. In construction we add a distinct review step against site records so approval is more than a signature.

Who should approve timesheets on a construction crew?

Start with the foreman or project supervisor, who knows who worked where. Send exceptions such as overtime or disputed hours to a project or operations manager. Payroll and billing staff then process approved hours rather than judging them.

How long should timesheet approval take?

It depends on your pay cycle, so set deadlines backward from the payroll run. A common pattern is a submission deadline, a review deadline a day or two later, and a correction window of about 24 hours. Name a backup approver so one absence does not stall payroll.

What happens if a timesheet needs to change after approval?

Treat it as a controlled adjustment. The approved record stays as it was, and a new dated entry records the change, the reason and who made it. This keeps the audit trail clean for payroll, billing and any prevailing-wage review.